I'll schedule some downtime to do the switch over. When I do, is this the correct procedure...
1. Gracefully shutdown all the VM's
2. Put all (3) hosts into maintenance mode
3. Disconnect the iSCSI cable from old switch and move it to the new one.
4. Exit out of maintenance mode
5. Verifty the iSCSI/datastore is attached
6. Startup the VM's
Thank you